F6006. Surface finishing, hardening

F6006. Surface finishing, hardening

Road, pavement, hardening

Including:

  • foundation and sewerage.

Parking places

Including:

  •  foundation and sewerage system.
Description Model Specification Unit Price per unit
From Till
Roads, pavement, hardening Asphalt 300 kg/m3 in 3 layers m2 75,- 92,-
Clinker paving 100 - 200 mm sand bedding m2 58,- 75,-
Road construction for heavy traffic m2 92,- 112,-
Parking 23 m2 per parking space Asphalt parking space 1.500,- 1.800,-
Clinker paving parking space 1.200,- 1.500,-
Tile pavement Precast concrete pavement slabs 2.000 x 2.000 x 140 mm m2 75,- 95,-
2.000 x 2.000 x 160 mm m2 75,- 100,-
Tiles With retaining, thickness 40 mm m2 31,- 46,-
Pavement Breaking up, removing and depositing in a heap m2 6,50 15,-
Impermeable pavement m2 105,- 210,-