Description | Model | Specification | Unit | Price per unit | |
---|---|---|---|---|---|
From | Till | ||||
Roads, pavement, hardening | Asphalt | 300 kg/m3 in 3 layers | m2 | 75,- | 92,- |
Clinker paving | 100 - 200 mm sand bedding | m2 | 58,- | 75,- | |
Road construction for heavy traffic | m2 | 92,- | 112,- | ||
Parking | 23 m2 per parking space | Asphalt | parking space | 1.500,- | 1.800,- |
Clinker paving | parking space | 1.200,- | 1.500,- | ||
Tile pavement | Precast concrete pavement slabs | 2.000 x 2.000 x 140 mm | m2 | 75,- | 95,- |
2.000 x 2.000 x 160 mm | m2 | 75,- | 100,- | ||
Tiles | With retaining, thickness 40 mm | m2 | 31,- | 46,- | |
Pavement | Breaking up, removing and depositing in a heap | m2 | 6,50 | 15,- | |
Impermeable pavement | m2 | 105,- | 210,- |