F6001. Soil investigation and retaining walls
F6001. Soil investigation and retaining walls
Description | Model | Specification | Unit | Price per unit | |
---|---|---|---|---|---|
From | Till | ||||
Soil investigation | Probing | Till 25 m | piece | 210,- | |
Drilling | Till 25 m | m | 80,- | 145,- | |
Adhesion measurement | piece | 125,- | |||
Setting out and levelling | piece | 65,- | |||
Retaining walls | Prefab, one sided retaining, with coupling strips | 1,5 m high, 0,21 m3 concrete/m | m | 290,- | 355,- |
2,5 m high, 0,44 m3 concrete/m | m | 430,- | 485,- | ||
3,5 m high, 0,8 m3 concrete/m | m | 645,- | 710,- | ||
5 m high, 1,5 m3 concrete/m | m | 1.070,- | 1.145,- |