F6002. Environmental soil examination

F6002. Environmental soil examination
Description Specification Unit Price per unit
Soil investigation NEN 5740/NVN 5740 piece 173,-
Sediment investigation RIZA package piece 535,-
Soil drilling Till 5,0 m-mv m 51,-
Monitoring well including surround Supply and installation m 30,-
Steel protecting cap Supply and installation piece 86,-
Sludge sample Sampling piece 30,-
Groundwater sample piece 56,-
pH, Ec, temperature, oxygen, redoxpotential Measuring piece 10,-
Surface samples (excl. hours) hour 20,-
Sampling container/depot piece 56,-
Asbestos Screening soil piece 102,-
Screening material NEN 5896 piece 76,-