F7029. Laboratory buildings, additional
F7029. Laboratory buildings, additional
| Main element | Description | Specialty | Unit | Price per unit |
|---|---|---|---|---|
| (24) Stairs and ramps | Main staircase | Simple | floor | 7.950,00 |
| Luxe | floor | 11.800,00 | ||
| Emergency staircase | floor | 5.000,00 | ||
| (52) Drains | Sludge pit | 5.000 liter | piece | 10.900,00 |
| 10.000 liter | piece | 15.900,00 | ||
| (57) Air treatment | Exhaust system | piece | 7.130,00 | |
| (59) | Architectural provisions for mechanical installations | Mechanical installations | % | 6,00 |
| (64) Communication | Telephone exchange | Separate system | connection point | 417,00 |
| Integrated system | connection point | 481,00 | ||
| (65) Security | Electrical sunscreens | Excluding sunscreens | piece | 350,00 |
| Emergency shower | piece | 2.007,00 | ||
| (66) Transport | People/goods elevator | floor | 20.250,00 | |
| (69) | Architectural provisions for electrical installations | Electrical installations | % | 2,00 |
| (74) Fixed sanitation facilities | Toilet group | Simple | piece | 17.400,00 |
| Luxuray | piece | 24.100,00 | ||
| Basement | m2 | 760,00 | ||
| (75) Fixed maintenance facility | Window cleaning rail (double) | m circumference | 267,00 | |
| Window cleaning installation | piece | 59.300,00 | ||
| (78) | Laboratory bench with lower cabinets | Medium | m | 1.585,00 |
| Complicated | m | 3.700,00 | ||
| Sink with upper cabinets | m | 7.400,00 | ||
| Acid fume chamber including facilities | Medium | m | 6.550,00 | |
| Complicated | m | 9.827,00 | ||