F7009. Warehouse buildings, Gross Floor Area (GFA)
F7009. Warehouse buildings, Gross Floor Area (GFA)
Inside wall 0,5 m
2 / m
2 GFA
Inside wall finishing: 1,0 finishing/m
2 GFA.
Cost of central heating such as CV boilers and air heaters are included in (56) heat distribution.
Main element | Description | Specialty | Price per m2 GFA |
---|---|---|---|
(43) Floor finish | Monolith | 11,- | |
Armor screed | Standard flatness requirement | 30,- | |
Increased flatness requirement | 38,- | ||
Mastic asphalt | 48,50 | ||
Epoxy coating | 35,- | ||
Polyurethane floor finish | 52,50 | ||
Magnesiet | 45,50 | ||
Anhydrite | 22,- | ||
(51)/(56) Heat generation / heat distribution | Hot water heating | 15 °C | 32,- |
Gas heating | 5 °C | 25,- | |
15 °C | 15,- | ||
(61) Central electrical facilities | Safety grounding NEN 1010 | 1,- | |
Cable ducts and cable trays | 3,- | ||
Low voltage main distributor | 1,- | ||
(62) Power supply | Combined light distribution device and power supply | 2,- | |
Powerplant general | 2,- | ||
(63) Lighting | Lighting installation | 150 Lux, conventional | 15,- |
250 Lux, conventional | 23,- | ||
Emergency lighting installation | 2,- | ||
(64) Communication | Sound installation | 4,- | |
(65) Security | Fire alarm evacution installation | 7,- | |
Burglar alarm installation | Simple | 2,- | |
Hose reel and fire extinguishers | 3,- |