F6009. Earth work

F6009. Earth work

Mechanical excavation: loading and transport over max. 5 km.

Manual excavation: dependant on soil type and depth.

Exclusive:

  • dumping fee.
Description Model Specification Unit Price per unit
From Till
Excavation Mechanically < 1.000 m3, in layers of 0 - 500 mm m3 7,35 12,70
> 1.000 m3, in layers of 500 - 1.000 mm m3 6,10 11,70
Manually m3 45,- 61,50
Backfilling soil Manually m3 22,50 31,-
Transporting surplus soil To depot at 3 km m3 5,80 9,80
Terrain fill With sand < 150 m3 m3 27,- 38,-
With backfill < 150 m3 m3 18,50 27,-